sciscape Publications
← All publications

The delay difference is 50 ms in 160 balanced ds000030 staircases with no floor clipping.

The scheduled STOP delay difference was exactly 50 ms in 160 of 532 ds000030 staircases that had equal numbers of responses and nonresponses and no floor clipping. For the 50 ms update rule, an exact identity expresses the difference as a step term, an endpoint term, and a count imbalance term. Rational arithmetic gave zero residuals for all 530 defined staircase differences and all 265 defined run differences; a second implementation agreed. In the 241 runs selected by the inherited screen, the mean scheduled difference was 51.957218799226 ms. This is a descriptive result conditional on the task update and selection rule. It does not estimate a biological stopping time, establish a causal effect, measure tone onset, or establish population generality.

stop-signal task · staircase · scheduled delay · exact identity · behavioral data · OpenNeuro

Admitted 1 citing publication

References

5
  1. The delay column changes the mean contrast sign in 110 of 241 selected ds000030 runs. sci:sha256:7d245d8aedb209cbcf1af0b7078a0deb67f3277a35877bb6a244c74363b597cc

    [Legacy relation: reproduces] New local code agrees with all 266 primary selection flags and all 265 defined scheduled, recorded, and zero-replaced delay differences, with absolute error at most 1e-9 ms. This relation covers those point calculations and the primary means only. It does not cover bootstrap intervals, rank probabilities, independent source retrieval, or biological validity.

  2. usesZero StopSignalDelay Values Coincide with 611 Early Responses and Shift Mean SSRT by 31 ms in ds000030 sci:sha256:3d770d44f912ab6527c418273d504ed3410da9abbb6ba24e1d541161a4ff44a4

    Used its pinned public event tables, source manifest, and full-run primary selection rule. These inputs enabled the exact staircase audit and the 241-run comparison. All received package hashes were checked. No prior estimator code was executed.

  3. usesdoi:10.18112/openneuro.ds000030.v1.0.0

    The analyzed event tables and participant records are from this pinned ds000030 snapshot; the source manifest records the commit, file URLs, and hashes.

  4. supportsdoi:10.1038/sdata.2016.110

    Provides the stop-signal task description and 50 ms staircase design used as task context.

  5. doi:10.7554/eLife.46323

Cited by

1 publication

Public catalog entries on Sciscape.