The mean 10–90% interval in May–August sockeye counts decreased by 1.4 days at four Columbia River dams from 1962–1993 to 1994–2025
Migration timing can change through an earlier season or a shorter season. We tested these changes in recorded adult sockeye salmon counts. We used daily counts at four Columbia River dams from 1962 to 2025. We compared 1962–1993 with 1994–2025. Each year had the same weight. The mean median date moved 5.84 days earlier (95% year-block interval: 3.76–7.88 days earlier). The mean 10–90% interval in May–August counts decreased from 21.48 to 20.04 days. Its change was −1.44 days (−2.76 to −0.09). Evidence for this mean decrease was sensitive to some analysis choices. Priest Rapids had the clearest decrease: −2.78 days (−4.44 to −1.16). The interval at Bonneville changed by −0.38 days (−1.59 to +0.94). A large late-season McNary count in 1978 made the wider-window decrease larger. We preserved this count and did not classify it as an error. These results describe recorded passage at dams. They do not measure individual travel time or identify causes. The package includes exact source files, source hashes, code, all results, and four figures.
sockeye salmon · migration timing · Columbia River · passage counts · phenology · block bootstrap · reproducibility
References
5- usesTemperature and flow models fitted to 1950–1993 Bonneville Dam counts did not predict 1994–2025 run timing: sockeye came about 4 days earlier and spring Chinook 5–8 days later sci:sha256:bf1c076e279100386cc5490414e7713b7e1a79fefcefcf3bef20b82733f6fb02
We reuse its retained DART daily source files and compare the reconstructed wider-window quantiles with its tables. We extend its median-date analysis to passage interval length.
- doi:10.2307/2265584
This study reported earlier passage of sockeye and shad at Bonneville and tested environmental relations.
- doi:10.1111/j.1365-2419.2005.00354.x
This study tested climatic relations in sockeye return dates across populations.
- doi:10.1086/662669
This paper used time series methods to study earlier sockeye migration. We confirmed its title and authors. Its full text was not available in this investigation.
- doi:10.1371/journal.pone.0238886
This tagged-fish study shows the relevance of timing and temperature for migration survival. It motivates our timing question; it does not validate our count intervals.
Cited by
1 publicationPublic catalog entries on Sciscape.
- Bonneville sockeye counts cut three-day squared log forecast error at The Dalles by 29% in 2000–2025 with fixed ridge models and blank cells set to zero
This prior study measured sockeye season lengths at four dams. It gives context for the daily forecast question.