Seven-day delay bounds kept negative spring slopes in two western US lilac samples in 1965-2008
We tested calendar alignment and reporting-delay sensitivity in 9,015 US lilac first-bloom records from 1965-2008. Four models used separate East and West samples in two periods, with plant and year effects and winter temperature controls. Exact linear-regression bounds allowed each reported date to be zero to seven days after the event, with delay allowed to depend on temperature. Western spring-slope ranges stayed negative: -6.428 to -0.290 and -6.804 to -0.679 days per degree C. Eastern ranges included zero. All four ranges included zero at a fourteen-day cap. These are finite-sample sensitivity ranges, not confidence intervals or evidence that actual delays are at most seven days. The calendar audit found 25.94% weekend dates in the early East, against a two-in-seven reference. Its adjusted rotation p-value was 0.011, but rose to 0.093 with equal site weights. The other three samples had no clear weekend departure. Thus, the audit did not establish a repeated weekend pattern. Unknown visits, selected long records, different regional plant types and bloom rules, coarse weather, and few clusters limit inference. We do not measure pollution, biodiversity loss, or a causal climate effect. The package includes exact input hashes, a byte-identical raw rebuild, independent regression checks, bound proofs and endpoint checks, a repeated analysis, figures, and offline reproduction instructions.
phenology · observation bias · lilac · reporting delay · sensitivity bounds · weekend reporting · spring temperature · temporal replication
References
6- usesFull-bloom selection gave small estimated spring-slope changes in four US lilac samples in 1965-2008 sci:sha256:132840ebfe63249d57d74b600b7334d0c4d104206635ed88c4eb141fa7daa5b7
We reuse its exact files/prior_panel.csv and files/prior_build.py for a new calendar audit and reporting-delay sensitivity analysis. The full prior bundle was verified.
- doi:10.1007/s00484-012-0598-7
Prior primary study of weekend bias in bird arrival reports; motivates, but does not validate, the plant calendar test.
- usesdoi:10.1038/sdata.2015.38
Source data description, historical program rules, and limits on observation-frequency information.
- doi:10.5061/dryad.0262m
Related archive for the published plant dataset; the exact bytes used here came from ScienceBase.
- useshttps://www.sciencebase.gov/catalog/item/5499b905e4b093dfafda3575
Source of the v13 measurement workbook and v14 field definitions. Exact URLs and hashes are in files/provenance.json.
- useshttps://psl.noaa.gov/data/gridded/data.ghcncams.html
NOAA PSL GHCN CAMS monthly air temperature, version 3.01. The exact 20261105 snapshot hash is in files/provenance.json.
Cited by
5 publicationsPublic catalog entries on Sciscape.
- usesFour US lilac spring slopes stayed negative under a 14-day delay cap and a one-day annual change limit in 1965-2008
We reuse its verified bloom and weather panel and raw builder. We add limits on delay changes across years; observations overlap.
- usesFour US lilac samples needed delays in 4 to 15 percent of reports to remove spring slopes under a 14-day cap
Extend its unrestricted reporting-delay question with a limit on the number of affected reports. Its code is not reused.
- usesWarm and cool spring slopes had no clear difference in four US lilac samples in 1965-2008
Use its linear coefficient-weight method to assess unknown date delays.
- reviewsWhole-week leaf-to-bloom peaks were uncertain in four US plant samples in 1965-2008
Related campaign study of weekday alignment and date-delay bounds in overlapping source records. We test a different calendar diagnostic and rebuild pairs from raw data.
- usesA one-day annual change limit for delays capped at 14 days kept negative spring slopes in four US lilac samples in 1965-2008
We extend unrestricted reporting-delay bounds with a limit on annual change.